Which Mars projects are being built now, and which are only on paper?
Research question: What Mars-bound hardware or crew programs are being built right now, and which exist only as paper plans?
The records show that the Starship-Super Heavy vehicle is in active flight operation, with the FAA authorizing up to 25 annual launches at Boca Chica 17, but the records do not tie it to a Mars crew program 20. Curiosity is an operating rover on Mars 8, and Tianwen-1 is described as ongoing 12. Tianwen-3 was in its preliminary prototype development phase as of March 2026 13. The Russian Ekspeditsia-M mission, planned from 2027, and a crewed Mars mission listed for 2033 both have unconfirmed status and remain plans rather than built hardware 36. Von Braun's 1948 Mars plan and its 1952 book are paper designs only 14. The newest fact is dated 14 October 2026, so the picture is current to within about two weeks 1417, but the evidence is only partial because it does not establish a crewed Mars vehicle in build today.
Sources
"Realmente contiene especificaciones técnicas para una expedición tripulada a Marte"The Mars Project
"es una de varias estaciones de investigación históricas, existentes o propuestas diseñadas para simular el entorno físico y psicológico de una misión de exploración marciana"Hábitat analógico de Marte
"Ekspeditsia-M [ 29 ] A partir del 2027 Aterrizador y lanzador A confirmar"Exploración de Marte
"Escrito por von Braun en 1948 y fue el primer "diseño técnicamente completo" para ese tipo de expediciones."The Mars Project
"During the AMADEE24 mission in Armenia, the GEOS experiment focuses on geologic survey activities at the simulated Martian landing site."The GEOS experiment onboard AMADEE24 crewed simulated mission to Mars (2025)
"[ 30 ] 2033 Misión tripulada A confirmar"Exploración de Marte
"Estos análogos están habitados por pequeños equipos de voluntarios y pueden operar en condiciones "similares a las de Marte" desde unos pocos días hasta más de un año."Hábitat analógico de Marte
"El 26 de noviembre de 2011 fue lanzada la Mars Science Laboratory (abreviada MSL), conocida como Curiosity."Exploración de Marte
"Traducido del original alemán por Henry J. White y publicado por primera vez en inglés por la Universidad de Illinois Press en 1953."The Mars Project
"Descubre la existencia de hielo , lo que apoya la teoría de las grandes cantidades de agua en Marte y provoca entusiasmo al ser una fuente potencial del líquido elemento para una futura misión tripulada a Marte ."Exploración de Marte
"En 2011 se lanzó la sonda rusa Phobos-Grunt con destino al satélite de Marte Fobos, pero luego de orbitar la Tierra algunos días sus sistemas electrónicos fallaron al intentar ponerlo en camino a su destino."Exploración de Marte
"天问一号 (代号: TW-1 )是 中华人民共和国 国家航天局 正在进行的一项 火星探测 任务"天问一号
"2026年3月,探测器研制处于初样研制阶段,并计划于本年度转入正样研制。"天问三号
"Starship-Super Heavy is composed of two stages: Super Heavy is the first stage"Notice of Intent To Prepare a Programmatic Environmental Impact Statement (PEIS), Open Public Scoping Period, and Hold Public Scoping Meetings on the Proposed SpaceX Starship-Super Heavy Launch and Landing Operations at the Boca Chica Launch Site at Starbase, Texas and Expansion of Starship Landing and Expenditure Locations (Transportation Department, Federal Aviation Administration, 2026-10-14)
"天问一号在 地火转移轨道 飞行约7个月後到达火星附近,在2021年2月10日完成火星捕获後进入环火轨道。"天问一号
"火星采样返回任务的关键性技术在眼下还不成熟,下一步将将耗时约二至三年开展先期关键技术研究。"天问三号
"Currently, SpaceX is authorized by FAA to conduct up to 25 annual launches and 50 total annual landings (25 of the Starship and 25 of the Super Heavy) per year at the Boca Chica Launch Site at Starbase, TX."Notice of Intent To Prepare a Programmatic Environmental Impact Statement (PEIS), Open Public Scoping Period, and Hold Public Scoping Meetings on the Proposed SpaceX Starship-Super Heavy Launch and Landing Operations at the Boca Chica Launch Site at Starbase, Texas and Expansion of Starship Landing and Expenditure Locations (Transportation Department, Federal Aviation Administration, 2026-10-14)
"天问一号所攜帶的「 祝融號 」火星车在火星 乌托邦平原 南部预选着陆区成功着陆"天问一号
"This phase represents a mature program launching more than 100 times annually and would be implemented within several years."Notice of Intent To Prepare a Programmatic Environmental Impact Statement (PEIS), Open Public Scoping Period, and Hold Public Scoping Meetings on the Proposed SpaceX Starship-Super Heavy Launch and Landing Operations at the Boca Chica Launch Site at Starbase, Texas and Expansion of Starship Landing and Expenditure Locations (Transportation Department, Federal Aviation Administration, 2026-10-14)
"SpaceX proposes to expand Starship landing and expenditure locations to support the evolving needs of the Starship program and broader space exploration objectives."Notice of Intent To Prepare a Programmatic Environmental Impact Statement (PEIS), Open Public Scoping Period, and Hold Public Scoping Meetings on the Proposed SpaceX Starship-Super Heavy Launch and Landing Operations at the Boca Chica Launch Site at Starbase, Texas and Expansion of Starship Landing and Expenditure Locations (Transportation Department, Federal Aviation Administration, 2026-10-14)
Ask your own question